As a kind of green renewable energy, biomass fuel is using widely in life and industry. How does it use for industry? It’s mainly for providing heat energy to boiler, dryer, kiln for furnace for production.
There are mainly 3 types of combustion of biomass fuel:
1. Direct fired-- pellet burner, biomass boiler, manual boiler etc.
2. Semi-gasification-- biomass gasification burner
3. Full-gasification- biomass gasifier
What’s the difference among them?
| Items | Pellet burner | Biomass gasification burner | Biomass gasifier | ||||
| 1 | Equipment cost | Lower, 1/3 of full gasification | Lower, less than 1/2 of full gasification, about 60,000 yuan / ton( $8695/T) | High cost, the market price exceeds 150,000 yuan / ton ($21740/T) | |||
| 2 | Avaible fuel | Forming pellets | Pellets,briquettes,wood chips | Pellets,briquettes,wood chips | |||
| 3 | Steam cost | Higher,close to natural gas | Much lower | 20% higher than biomass gasifier | |||
| 4 | Operator | 1~2 people/shift for one machine | 1~2 people/shift for one machine | More than 5 people/shift for one machine | |||
| 5 | Combustion system | Direct-fired | High temperature pyrolysis semi-gasification | Complete gasification | |||
| 6 | Tar | Tar can burn directly | Tar can burn directly | Tar needs to be recycled and needs to be disposed of in hazardous waste | |||
| 7 | Slag discharge way | Manual slag cleaning, intermittent operation | Optional automatic slag discharge,24 hours continuous operation | Automatic slag discharge, 24 hours continuous operation | |||
| 8 | Integrated thermal efficiency | 90%, only the exhaust ash residue Fuel ash 4%, furnace heat loss of about 5% | 93%, only the exhaust ash residue Fuel ash 4%, furnace heat loss of about 3% | No more than 80%, about 18% charcoal discharge The heat loss of furnace body is about 2%, and the cooling heat of gas through filtration is about 5% | |||
| 9 | exhaust emission | Higher,dust≧100mg NOX:High | Less, dust≦50mg NOX:less | Less,dust ≦30mg NOX:less | |||
| 10 | Installation space(No fuel storage) | About 15m3 Boiler room Installation | About 30m3 Boiler room Installation | 50m3~100m3 Outside the boiler room, there should be enough space for installation | |||
| 11 | Installation and renovation period | Shorter,2~5days | Shorter,3~7days | Longer,20~40days | |||
| 12 | Maintenance cost | Low cost, simple and cheap accessories | Lower, simpler, cheaper accessories | High, more complex, high accessory price | |||
| 13 | Installation pictures | ![]() | ![]() | ![]() | |||
For more information:
+86 18144753064
Website: www.greenvinci.com
Facebook : https://www.facebook.com/greenvincimachinery/
Twitter : https://twitter.com/cnbiomass
Linkedin : https://www.linkedin.com/company/13300441/
Youtube : https://www.youtube.com/user/cnbiomass