Rough introduction about the project:
Situation: 30 Shrimp ponds, 36 m3, 1.3m deep
Requirements: Water temperature 26-28℃
Recommendation: 900,000 kcal biomass hot water boiler (after detailed calculation)
Customer’s final choice: 2 sets 1,200,000 kcal biomass hot water boiler (operating power 70%) in series connection. Open 2 when it is cold enough. At ordinary times, open 1 and spare 1. If the head is not high, the boiler and heat exchange coil can be directly circulated without using hot water tank.
Results: Reduce operating cost and keep in stable operation.


GreenVinci pellet burner hot water boiler is a best option to villas, hotels, hospitals, factories, restaurants, schools, sauna center, beauty salon, swimming pool, greenhouse, food factories, laundries, industrial hot water, central air condition and heating spaces.
Mainly used in home and industrial to support hot water and other heating system. With the advantage of high acceptance by operators , environmental friendly ,low operating cost, simple operation and maintenance , saving 30 ~ 60% of fuel costs than the traditional fuels Oil/Gas/Electricity burners







